Displacement of a high-voltage line

SBB 66 kV line LT 177: Delémont - Bassecourt - Courtemaîche

The Bassecourt railway station has undergone major works to allow the creation of a 2nd track to increase the rate between Delémont and Porrentruy. The creation of this second track involved moving the 66 kV HT line northwards between masts 79 and 84. The study began in 2015 and the line was completed at the end of 2017 with its commissioning.