50 kV line: Gösgen - Oberbuchsiten

The 50 kV control line Kappel - Oberbuchsiten was built in 1971. It represented the largest bottleneck in the distribution grid of Aare Versorgungs AG (AVAG). After about 40 years, the line had reached its capacity and age limit. In order to maintain operation, a new 50 kV line connection was built from the Gösgen substation to the Oberbuchsiten substation.